4. ARSENIC MITIGATION INITIATIVES BY DIFFERENT ORGANIZATIONS
4.1. DEPARTMENT OF PUBLIC HEALTH ENGINEERING (DPHE)
Although in 1993 the presence of arsenic in tubewell water was first detected, the magnitude and extent of the problem was not known clearly before 1997. Various agencies and DPHE conducted tests of tubewell water samples from different districts randomly and a comprehensive test could not be done due to lack of testing facilities in Bangladesh. DPHE with the donor agencies is conducting various survey, study and mitigation activities in the country. A brief on arsenic related projects is as follows.
Under the assistance of UNICEF the testing of arsenic in water sample of tubewell water with field kit was started from July 1997 all over the country. Over 50 thousand tests were conducted and in 190 upazilas presence of arsenic contamination was found. The survey indicated a contamination of 27% tubewell among the tested wells. Under the project 170 exploratory drillings were done in arsenic problem areas, where 95% of the tubewell having depth> 200m shows no arsenic contamination. Awareness building activities were also done under this project. The cost of the project was Tk 199.59 lakh with PA Tk 134.00 lakh. The project started on October 1996 and ended on June 2000.
DPHE-UNICEF action research project in 5 upazilas: A project was implemented in 5 upazilas of the affected areas. These are Manikganj, Sonargaon, Kochua, Bera and Jhekargacha. The activities were conducted by engaging 4 NGOs. The four major activities were conducted in these upazilas. Those are awareness building, testing of tubewell water sample and marking with paint the contaminated and uncontaminated tubewell. Identification of patient suffering from arsenicosis and providing alternative water supply options particularly the demonstration of them. A total of 105179 tubewells have been tested and an average contamination of 60% was found. Under the project about 1.2 million people have been surveyed for arsenicosis and a total of 744 patients were identified. The project also provided 13,733 safe water options (28 deep tubewell, 13 tubewell sand filter, 13 dug wells, 266 rainwater harvesting tank, 52 PSF, 4 community type plant and 13357 – Kolshi filter) to the community for action research. The project was implemented as R&D activities and a follow up action programme is continuing. Under the follow up programme, apart from the usual mitigation options, Mini piped water supply system is under implementation at Sonargaon upazila. On the other hand, community based arsenic removal plants have been installed and under installation at Bera upazila.
DPHE-UNICEF has started a similar programme in 15 upazilas under arsenic affected areas and an investment project for arsenic mitigation in 25 upazilas will be taken up in the year 2002. A total of 7.5 US $ will be provided by UNICEF for this project. Under this project by November 2001 a total of 221174-tubewell water samples have been tested out of which 70% were found contaminated.
Under the assistance of British DFID, DPHE and British Geological survey conducted a systematic and comprehensive survey in 61 districts (except in 3 hilly districts). About 3500 water samples were collected from field and tested in DPHE laboratories in Bangladesh and BGS laboratory in England. The survey indicated that in 249 upazilas of 61 districts the problem exists. But the magnitude of the problem is not same in everywhere. The variation of affected tubewell in upazila varies from 1% to over 90%. The most affected areas lies in south south-eastern part of Bangladesh. In country context about 28% of the tested samples show arsenic concentration above the Bangladesh limit of 50 ppb. The study indicated the deep aquifer in the coastal belt is nearly safe to contamination (0.7% contaminated). The cost of the project was Tk 609.29 lakh with PA Tk 578.35 lakh. The project started on December 1997 and ended on March 2000. The combined survey of DPHE-UNICEF-DFID identified 268 upazila having arsenic problem in 61 districts(excepting 3 hill tracts districts)
DPHE under the assistance of JICA is conducting a study to investigate the deep groundwater and possibility to use it for the mitigation of arsenic problem in three western districts of Bangladesh (Jessore, Jhenaidah & Chuadanga). The study started on May 2000 and will continue up to March 2002. The out come of the project is yet to be finalized. The cost of the project is estimated of Tk 2599.04 lakh with PA of Tk 2460.61 lakh.
DPHE-DANIDA Arsenic Mitigation Pilot Project: A pilot project under DPHE-DANIDA has been taken up in the south-eastern part of Bangladesh. The estimated cost of the project is about Tk 7070.57 lakh . The project is designed for three years and a half (upto June’2004) and will be implemented in two phases. The main components of the project will be Deep tube well, Mini piped water scheme, Household treatment unit. The project has started its activities in the project areas under DANIDA.
DPHE, under GOB-4 project is implementing several alternative water supply options like PSF, Ring well and DeepTW in arsenic affected upazilas. No shallow tubewells are installed in these affected areas.
DPHE under R&D activities conducted the following activities;
Arsenic Mitigation experiences of DPHE are shown in Table 4.1 (Appendix-1).
4.2 BANGLADESH ARSENIC MITIGATION WATER SUPPLY PROJECT (BAMWSP)
Bangladesh Arsenic Mitigation Water Supply Project (BAMWSP) was conceptualized jointly by the Government of Bangladesh, the World Bank and the Swiss Agency for Development and Cooperation. The project was launched in September 1998. The overall objective of the project is to reduce mortality and morbidity in rural and urban population caused by arsenic contamination of groundwater within sustainable management strategies. Project activities include understanding of the arsenic problem through national survey; strengthening implementation capacity of the local government entities and community based organizations; and onsite mitigation through subproject development and implementation by the community based organizations.
Arsenic Mitigation Experience
BAMWSP initiated a nationwide screening, community development and mitigation program. Screening of tubewells are being conducted in 147 upazillas and 100 municipalities. Mitigation activities are going on in 35 upazillas. Major planned activities include strengthening the capacities of local government institutions, establishing rural safe water supply management and providing necessary support to the communalities for building up their capacities in water supply management.
The project has under taken a program to cover 188 Upazillas for screening, community development and mitigation. Through this project, screening, community development and mitigation in 6 Upazillas have been completed. Screening of another 35 Upazillas have been completed, and community development and mitigation program of this component will be completed by June 2002. The screening, community development and emergency mitigation of another 147 Upazillas will be completed by June 2003
Alternative Technology Options
The Technology Advisory Group of BAMWSP selected a few technologies
for implementation. Experience with these options are given in Table 4.2
(Appendix-1).
4.3 UNICEF
Brief Description
The UNICEF Program of Co-operation with the Government of Bangladesh contributes to the realization of women’s and children’s rights through a variety of inter-sectoral and sectoral initiatives in health, education, water, sanitation, protection, and early childhood development. The Water and Environmental Sanitation (WES) Program of UNICEF improves access to safe water and sanitation, especially in un- and under-served areas, works with government and its partners to mitigate the arsenic crisis and is also promoting a sanitation and hygienic package for school children.
Arsenic Mitigation Experience
The WES program has adopted an integrated sanitation, hygiene and water supply demand-driven approach in partnership with other development partners. The program includes support for testing water quality and exploring alternate low-cost safe water technologies. Arsenic mitigation activities of the program includes improving water quality (including arsenic measurement, mitigation and research) to urgently address the problem of arsenic contamination, and the blanket testing of 1,000,000 tube wells in 45 thanas (1/4 of the area affected), information and awareness campaigns, equipping zonal laboratories for water quality testing, training staff and providing alternative water technologies to affected communities. The program continues to work closely with the World Bank-supported Bangladesh Arsenic Mitigation and Water Supply (BAMWSP) project and with other international agencies and NGOs.
Alternative Technology Options
UNICEF’s experience with various arsenic mitigation related technologies is summarized Table 4.3 (Appendix-1).
4.4 NGO FORUM FOR DRINKING WATER SUPPLY AND SANITATION
Brief Description
NGO Forum is a national apex networking and service delivery organization in the water supply and sanitation sector dedicated to contribute in the improvement of the public health status of the poor and disadvantaged women, children and men of Bangladesh. NGO Forum comprises of over 600 partner NGOs, CBOs and private sector actors who implement water supply and sanitation program at the un-served and under-served rural and urban communities. This organization is committed to contribute to reducing morbidity and mortality caused by water and excreta-borne diseases ensuring safe, accessible affordable and sustainable water supply and sanitation services adopting software-hardware mixed approach. The Forum promotes adaptive learning and community-managed water supply and sanitation services. It utilizes its vast experience and works as development partner with all concerned NGOs, CBOs and private sector, national and international agencies and other stakeholders to promote sustainable safe water supply and sanitation facilities.
Arsenic Mitigation Experience
NGO Forum has so far under taken seven projects and programs on arsenic mitigation. These activities range from installing alternative arsenic safe water sources to establishing an information support unit for NGOs. It is providing training for trainers in 147 upazillas and 100 municipalities. NGOF has introduced a number of mitigation options including pond sand filters, arsenic removal plants, rainwater harvesters, dug wells, and piped water system.
Alternative Technology Options
NGO Forum’s experience with the various options is summarized in Table
4.4 (Appendix-1)..
4.5 BRAC
Brief Description
BRAC, a national private development organization, was set up by its Founder Executive Director Mr. Fazle Hasan Abed in 1972. BRAC was initially established as a relief organization to afford relief and assistance to resettle refugees returning from India after Bangladesh’s liberation war. The task of relief and rehabilitation over, BRAC turned its focus on the long-term issue of poverty alleviation and empowerment of the poor in the rural areas of Bangladesh. Today, BRAC promotes income generation for the poor, mostly landless rural people of Bangladesh, through micro-credit, health, education and training programs. Previously known as Bangladesh Rural Advancement Committee, BRAC is now a multifaceted organization with over 25,000 regular staff and 31,000 part-time teachers, working in 50,000 villages in all the 64 districts of Bangladesh. The projected budget of BRAC in 2001 is US$ 153 million of which Donor contribution accounts for 21%.
Arsenic Mitigation Experience
BRAC, in collaboration with DPHE and UNICEF, has been conducting an action research program on community-based arsenic mitigation in two upazillas (Jhikorgacha and Sonargaon) since June 1999. The objectives of this project are to assess the technical viability and effectiveness of various alternative safe water options as well as their social acceptance. BRAC also screens tubewells for arsenic contamination, builds awareness among communities, identifies arsenic patients and provides medical care.
Alternative Technology Options
BRAC has experimented with a large number of alternative technology
options to supply arsenic safe water. A summary of the technologies is
given in Table 4.5 (Appendix-1). It may be mentioned that BRAC has recently
started to implement low-cost piped water supply schemes in several villages
in collaboration with the Rural Development Academy and local communities.
Under these schemes local communities contribute 20% of capital costs and
100% operations and maintenance costs of the projects.
4.6 DHAKA COMMUNITY HOSPITAL (DCH)
Brief Description
Dhaka Community Hospital is a trust owned, non-profit making, self sustaining healthcare organization. It was established in 1988. Since its inception, DCH has been experimenting an integrated and sustainable healthcare delivery system at affordable cost both in urban and rural areas of Bangladesh. It has successfully introduced health insurance scheme in its project areas bringing modern healthcare facilities to the less affluent section of the population.
Arsenic Mitigation Experience
DCH is the pioneer organization in the field of arsenic mitigation in Bangladesh. DCH was one of the first institutions to detect arsenic patients in the country. Since then DCH has conducted arsenic detection and patient identification programs in many parts of Bangladesh. DCH also manages arsenic patients and build public awareness through its various programs.
Alternative Technology Options
DCH has introduced a number of alternative options to counter the arsenic contamination. A summary of the experience with these technologies is presented in Table 4.8(Appendix-1).
4.7 ASIA ARSENIC NETWORK
Brief Description
The Asia Arsenic Network (AAN) is a Japanese citizens’ association established in April 1994 based on the experience of helping arsenic victims in Japan. In Bangladesh, AAN has been working since 1996 to find out the measures to obtain alternative sources of safe drinking water and to reduce the sufferings of arsenic victims.
Arsenic Mitigation Experience
The Asia Arsenic Network carried out a comprehensive project in Samta
village of Jessore district. The project had been carried out for three
years from March 1997 to February 2000 under promotion of the Toyota Foundation.
Its purpose was to investigate the actual conditions and cause behind the
arsenic contamination of groundwater, and take measures in coordination
with local researches and residents. In April 2000, AAN started its "Mobile
Arsenic Center (MAC)" activities. MAC is a comprehensive approach by a
team of professionals in the medical, chemical, water supply engineering
and awareness education fields. At the present moment, AAN conducted MAC
programs in thirteen villages of Jessore, Jhenidah, Satkhira, Meherpur
and Chuadanga.
Alternative Technology Options
AAN has introduced several alternative options to counter the arsenic contamination. A summary of the experience with these technologies is presented in Table 4.7 (Appendix-1).
4.8 GRAMEEN BANK
Brief Description
Grameen Bank, a specialized financial institution providing group-based credit to the landless and assetless poor started its operation in 1976. Grameen Bank has nearly 2.4 million members of whom 95% are women. It is serving through 1,152 branch offices covering about 60% of the villages in the country. Currently it disburses 30-40 million US Dollars a month through a variety of loans. The Grameen Bank loans are completely free of collateral. The main objective of the bank is to make banking services available to the landless rural poor and bring positive changes in their lives and socio-economic condition.
Arsenic Mitigation Experience
In October 1997, Grameen Bank has started an arsenic mitigation pilot project with assistance of UNICEF and Department of Public Health Engineering (DPHE). The program was implemented in Kochua upazilla of Chandpur district. The first phase of the project was started in 20th August 1999 in three unions. In December 1999, the project area was extended into 12 unions. The main objective of the project includes screening of tubewells, awareness and capacity building of the community, and community-based solutions for arsenic contaminated areas.
Alternative Technology Options
Grameen Bank experience with various arsenic mitigation related technologies are summarized in Table 4.8 (Appendix-1).
4.9 PROSHIKA
PROSHIKA Manobik Unnayan Kendra is a national NGO primarily involved
for human development in the country. For almost three years PROSHIKA has
been running a Belgian made package surface water treatment plant known
as HYDROPUR. After a testing period, PROSHIKA has entered into partnership
with ALTECH Co. of Belgiam to start a joint venture manufacturing company
in Tejgaon Industrial Area, Dhaka to produce medium size surface water
treatment plants and install them in rural areas of Bangladesh where groundwater
is contaminated with arsenic. The unit has automatic backwash and chlorine
release systems and produces safe water from surface water available in
rivers and pond in Bangladesh.
4.10 AQUA CONSULTANTS AND ASSOCIATES LTD.
AQUA Consultants and Associates Ltd. is a private consulting firm providing services to the WSS sector. AQUA under the assignment from DPHE designed and implemented a number of urban water supply programs where arsenic removal plants were constructed. Most of these constructions were carried out in the later part of 1990s and completed in 2001. Plants are located in six different district towns and were originally designed as iron removal plants. Since iron removal plants also work as arsenic removal plant and arsenic was found to be present in groundwater in those urban towns, the units were then termed as iron-arsenic removal plants. The plants provided arsenic safe water to 6 urban centers where both arsenic and iron are present in groundwater. The plants are relatively expensive and there is no provision for safe disposal of sludge.
4.11 BANGLADESH ENGINEERING AND TECHNOLOGICAL SERVICES LIMITED (BETS)
Bangladesh Engineering and Technological Services Limited (BETS) is
a private consulting firm providing services to the WSS sector.
BETS was associated with the 'Rapid Assessment of Household Level
Arsenic Mitigation Techniques' as local counterpart to WS Atkins International
Limited during September 2000 to March 2001. Currently BETS is conducting
a study on "Groundwater Development of Deep Aquifers for Safe Drinking
Water Supply to Arsenic Affected Areas in Western Bangladesh" started in
June 2000.
5. INSTITUTIONAL ARRANGEMENT FOR SERVICE DELIVERY
5.1 PAST EXPERIENCE
During late sixties, District Councils were primarily responsible for providing water supply in the rural areas. Later, Basic Democrats of Union Parishad were involved in the program. Department of Public Health Engineering (DPHE) used to deliver tubewell materials to the Basic Democrats and allocate a lump sum amount as installation cost to carry out installations. This Program could not meet the demand of the community because of absence of appropriate institutional mechanism for quality control in the service delivery and lack of accountability.
Soon after liberation, DPHE was identified to take lead role of water supply delivery in rural areas and a decentralized institutional network up to Thana (Upazila) level was established in early seveties. Site selection committee was formed at Union level with the participation of Union Parishad Chairman and Ward Commissioners to take decision on selection of sites only, while DPHE took the responsibility of installation through contractors.
It was observed through evaluation of the program that community had
least control over the quality and cost of installation, only a part of
which was borne by the beneficiaries. The cost of tube wells increased
over the years and the allocation of tube wells mostly favored the influential
community. As a result the program could not reach the low income group
in most cases. This situation was more acute in low water table area and
coastal belt.
5.2 PRESENT SITUATION
It is evident from the preceding chapters that the water supply in the country is now facing a number of challenges from various angles. For the last decade or more, the efforts of Government, NGOs and donor organizations had succeeded in creating a "water miracle" in Bangladesh that has often been highlighted as a global success. Taking advantage of the shallow water aquifers, and aided by a public sector campaign encouraging people to shift from surface water to ground sources, the introduction of shallow tube-wells enabled 97% of rural households access to "safe" drinking water. The hand pump mounted on tube-wells produced by the private sector and purchased directly by households created, perhaps, the largest private sector supported "safe" drinking water program in South Asia. The arsenic contamination, however, is threatening to undo this success. Unless household level filtering systems become affordable and convenient to use, and preferably easy to link to the shallow tube-wells, the "water miracle" may well be reversed. The arsenic menace has significant bearing on : technological options; financial dimension; and importantly on institutional framework for service delivery.
The broad spectrum of institutional arrangement should be such that
it ensures sustainable development. The services that are required, be
it technological or financial, need to be delivered optimally. The situation
now demands to review and reform the institutional arrangement to address
sector issues appropriately. The various technological options appropriate
to specific regions, hydrogeological situation, and socio-economic context
will have direct relation on financial resource and institutional competence
to deliver services.
5.3 APPARENT TRANSITION
The drinking water sector institutions and delivery mechanism in Bangladesh are at cross-roads and undergoing major transition. Water supply options that are emerging will find place in line with user choice and preference. In specific geographic units the degree of arsenic contamination may force rural households to shift from individual to community based systems for accessing drinking water. Likewise, in urban areas households depending on non-piped point sources may need to explore alternatives. In both cases financial sustainability will be a major challenge and therefore efficiency of service delivery is of paramount importance today.
Technologies that are alternatives to the shallow tube-well are therefore being explored. Community based systems – as a delivery option now needs to be actively discussed in the policy debate on arsenic mitigation. In many areas, the density of rural settlements in Bangladesh and the growth of rural incomes, and the convenience of the current level of service in the last two decades have created an enabling environment, cost effectiveness and affordability for house connections through network systems. In terms of the arsenic contamination, piped water systems are advantageous over the household level technology because the system can be managed and monitored at one point. Furthermore, the treatment technology can be easily improved/altered centrally as and when better alternatives become available. Finally, a central treatment system also allows for the removal of pathogenic contamination of surface water.
The above scenario calls to re-think on the existing institutional set-up and redefine the roles of communities, private sector, non-government organizations, local governments and the central government. A greater role of local government is envisaged.
The public choice and consumers’ welfare issues involved in water quality monitoring and in managing water resources, suggest that local governments need to be directly involved in the arsenic program. These same public choice issues also require that local governments will need to be a partner in the scale-up and sustainability of water systems. A policy pilot, where resources are provided directly to a set of local governments and a source of technical advice through a consortium contracted in from the private sector is made available, may need to be tried out in the current setting of the transitions that are occurring in Bangladesh. Finally even as capacity is contracted in, there would be a need to establish some minimum in-house capacity with Union Parishads (UPs) in financial management and social mobilization to support the political leadership.
This pilot could start in the one district where Union Parishad capacity is already being built up with support from an ongoing project. Once the pilot is implemented, the demonstration effect will familiarize and motivate Union Parishads to scale up their involvement in the public goods dimensions of managing rural services. In this context, Development Partners could assist the Government to look at the design of a broader capacity process to support the strengthening of local governments.
A series of immediate actions can be undertaken in the 35 Upazillas where BAMWSP has finished screening. As mitigation will start immediately in those Upazillas where over 40% sources have been found arsenic affected:
5.4 RATIONALE FOR GIVING A KEY ROLE TO LOCAL GOVERNMENTS
The appropriateness of arsenic mitigation being led at the local level arises first from the principle that local government is the key custodian of local public policy. It is best placed to judge what suits local conditions, provided it has access to information on the range of technology and delivery options. The arsenic situation in rural areas calls for management of these day-to-day public choice issues as close to the affected people as possible. Critical issues, including repeat screening of arsenic contaminated and non-contaminated sources, sustainability of programs, public education and operation and maintenance of systems are more effectively managed at the local government level. The crisis of coordination and trade-offs with regard to technology-investment choices are best handled at the local government level where a range of options open to communities and are well interfaced with the local government.
Secondly, public subsidies critical to the mitigation efforts need to be managed by the appropriate local institutions to avoid ownership and other long-term management issues. These critical variables require political judgment at the local level.
Arguments that local governments lack capacity, that they are subject to local elite capture and that they are prone to corruption are often articulated in the policy debates about the role of local government. It is clear that political rivalries, corruption, incompetence, ignorance and inadequate resources pose threats to successful program implementation, but this is true of any tier of government and across public-private divide. There is little evidence that involvement of local governments is necessarily more prone to poor governance. Ultimately, it is a question of how decentralization of responsibilities are designed and managed and not a question of decentralization per se. Much of the concerns can be best mitigated through design of checks and balances.
The same principles apply on the issue of capacity. Experience shows that capacity does not grow independently of responsibility. Indeed, there is a potential synergy between growth of capacity, decentralization of responsibilities with authorities, and building accountability of local governments. The design issue is therefore to support this synergy by providing a mechanism which will support local government capacity building .
5.5 ROLE OF COMMUNITIES, PRIVATE SECTOR AND NGOS
A critical element in this approach is the role of NGOs and how they interface with local government, communities and central government, when the technology for arsenic mitigation goes beyond the realm of the household into one where village/community level public policy decisions need to be made. The extent of central or local government involvement in NGO arsenic mitigation programs is likely to increase if community water supply schemes are to be scaled up.
NGOs, working with the community and Union Parishads (UPs), would help to set up local service providers serving one or two villages. The NGO would work to mobilize community groups and help them develop local water utilities which could be run on either profit or non-profit basis. User charges should cover at least the Operations and Maintenance charges and replacement costs of equipment such as pumps.
5.6 ROLE OF CENTRAL GOVERNMENT
The Local Government Division (LGD) of the Ministry of Local Government, Rural Development and Co-operatives (MLGRD&C) is the nodal Government unit for the sector. Its recently established National Forum for Water Supply and Sanitation should be fully operational with requisite resources and skills to manage the entire sector needs. The Unit for Policy Implementation (UPI) which is supporting the LGD should be mainstreamed as the analytical body for the LGD. The LGD needs to effectively co-ordinate its different management and implementation organizations including the Pourashavas, the City Corporations, the Water and Sanitation Authorities in Dhaka and Chittagong, Local Government Engineering Department (LGED) and the nodal technical organization DPHE.
The Public Sector Agency, DPHE, which is the lead technical organization
responsible for supporting the LGD and the Local Governments in planning,
delivery and management of the sector, requires a serious thrust towards
water supply regulations, planning, research, monitoring and surveillance
in order to provide technical oversight for the sector. There is a need
for building DPHE's capacity as Government regulatory body for the water
supply and sanitation sector. It's capacity needs to be strengthen for
strategy development, planning, survey investigation, research, monitoring,
evaluation and water quality surveillance.
First, local governments must have clear expenditure assignments and a clear source of predictable funds to undertake the responsibility. In this case, funds for arsenic screening and mitigation would form the entry point. In the future, for example, BAMWSP project funds can be converted to programmatic funds for local governments.
Second, local governments should have access to grant funding to "buy-in" capacity as and when needed. This "demand window" recognizes that capacity needs will have to be defined in the local context in a dynamic fashion—in different phases of the implementation of the arsenic mitigation program local governments will need different forms of capacity. As these needs emerge, local governments should have access to a rapid response fund to acquire the capacity form the market.
Third, local governments should have access to a "supply window". This window recognizes that there are some fundamental systems of financial management, planning, social mobilization and other parameters are the pre-requisite for a good local government system. Mobile teams from special resource centers comprising these needed skills would serve clusters of local governments to help build up the basic systems of financial management, planning etc. Such supply side teams would also assist local governments to access the demand window, if needed.
Fourth, there should a be "fiscal incentive" window which would reward those local governments that have been able to use the demand and supply windows of support to reach certain milestones in delivery (in this case arsenic mitigation or piped water implementation) and of setting up the basic local government financial management systems.
Finally, a M&E system needs to be developed by the upper tier government to ensure constant learning from on the ground reality. It also ensures a check and balance that is needed to impose a culture of accountability.
Applying these windows to the case of the arsenic mitigation program, the following approach may be considered. A National Capacity Building System (NCBS) could be set up in Bangladesh that would operate under two systems – a supply based system where it would be funded up front to develop demonstration projects in different UPs which could then be replicated. The demonstration project would also include UP capacity building so that eventually they may spread them across the union. Instead of pilots a plan for national support through mobile teams could also be tested. The second would be a demand-based system where the NCBS would operate on demand from unions for help.
The incentive to have local governments use the capacity support could
be delivered through a challenge fund. A challenge fund could also be developed
to provide an incentive for local governments to come up with innovative
mechanisms to manage community water supply systems using independent service
providers.
6. CONCLUSIONS
6.1 ALTERNATIVE WATER SUPPLY OPTIONS
Safe water supply in arsenic contaminated areas is a priority to avoid arsenic poisoning. Uncontaminated shallow tubewells will continue to be the sources of safe drinking water supply for 75 million rural and urban population even in arsenic affected areas for years until these tubewells are found contaminated. The national screening program for identification of arsenic contaminated tubewells should be completed as soon as possible. A regular water quality monitoring and surveillance program is also required to be installed to observe the possible change in arsenic content of these safe shallow tubewells. Alternative water supply systems would replace the contaminated tubewells and those turn out to be subsequently contaminated during monitoring to maintain the present level of water supply coverage.
Preliminary estimation presented in this paper shows that about 29 million
people exposed to arsenic contamination in excess of 50 m
g/L will require alternative safe water supplies. The available alternative
options are area dependent and have their relative advantage and disadvantages.
Hence, no single option can serve the purpose or respond to the needs of
the people having different social and economic conditions. The following
alternative options may be considered for water supply in the arsenic affected
areas.
6.1.1 Deep Tubewell
Deep tubewells may be installed to avoid shallow arsenic contaminated aquifers where suitable arsenic safe deep aquifers are available to produce water of acceptable quality for water supply. Manually operated deep tubewells are source of safe and reliable water supply in many parts of the coastal area. The manually operated deep tubewlls have very low draw-down and insignificant impact on hydraulics of deep aquifers. It is important to first delineate the areas where such deep aquifers are available that are separated from shallow contaminated aquifers by relatively impermeable layers. The bore holes of the deep tubewells are required to be sealed at the level of impermeable strata to avoid percolation of arsenic contaminated water. An aquifer formed by oxidized coarse reddish sands appears to be safe for installation of tubewells. Hydrogeological investigations are needed to delineate suitable deep aquifers and ascertain the mechanism of recharge and possibility of contamination of these aquifers.
6.1.2 Piped Water Supply
Piped water supply having advantages over tubewells can very easily replace existing shallow tubewell based water supplies. Piped water supplies for all domestic purposes may be costly for low income group of people. On the other hand, piped water system would be technically inconvenient and costly for scattered rural population living in flood plains. Piped water supply is a potential solution to arsenic problem in the following areas.
6.1.3 Treatment of Surface Water
Surface water is arsenic safe but invariably contains impurities of greater immediate health concerns. Surface water requires treatment for desired level of clarification and disinfection. Protected sources make treatment easier and a unprotected source requires elaborate treatment for removal of impurities of different origins. Most importantly, the surface water sources must be perennial and availability of such sources may be difficult in many places.
6.1.4 Dug Well
Dug wells may be constructed where
feasible for arsenic safe water supplies. The areas with aquifers at shallower
depth and the hilly areas are suitable for the construction of dug wells.
The areas with thick consolidated clay layers like the Madhupur and Barind
tracts are not suitable for dug well construction. A larger diameter dug
well installed in favorable aquifer can be used for community water supplies.
Sanitary protection and careful monitoring of water quality are essential
components of dug well based water supplies. Unstable soil conditions in
many places will require lining or side protection, which will make system
expensive. There are also construction difficulties in the wet season when
water table rises up.
6.1.5 Rainwater Harvesting
Rainwater harvesting has good potential for water supply in arsenic
and salinity affected areas in Bangladesh. People need motivation to adopt
this system of water supply. Because of the requirements for large catchment
areas and storage tank due to unequal distribution of rainfall throughout
the year, rainwater harvesting should be a household option and designed
to meet the demand for drinking and cooking water only. The catchment area
and storage tank need standardization in relation to rainfall intensity
and distribution in Bangladesh.
6.1.6 Treatment of Arsenic Contaminated Water
Removal of arsenic from contaminated water for drinking water supplies
has drawn remarkable attention in recent years. Some units developed for
treatment of arsenic at household and community levels and installed for
experimental use in different parts of Bangladesh have shown very good
potentials for use in water supply in arsenic affected areas. Relatively
higher costs and management of arsenic rich waste products are yet to be
addressed. However, prospective technologies are being evaluated under
Environmental Technology Verification program in Bangladesh.
6.2 RESEARCH AND DEVELOPMENT NEEDS
There are many areas of research and development in diverse fields of alternative water supplies in Bangladesh. Some of them are listed below:
Ahmed, M. F. (1999), Rainwater Harvesting Potentials in Bangladesh, Proc. 25th WEDC Conference on Integrated Development for Water Supply and Sanitation, Addis Ababa, Ethiopia, 30 Aug.-3 Sept.
Ahmed M.F and Rahaman M. M. (2000), Water Supply and Sanitation - Low Income Urban Communities, International Training Network (ITN) Centre, BUET.
Ahmed. F. , Jalil, M.A., Ali, M.A., Hossain, M.D. and Badruzzaman, A.B.M. (2000), An overview of arsenic removal technologies in BUET, In M.F.Ahmed (Ed.) Bangladesh Environment-2000, Bangladesh Poribesh Andolon, 177-188.
BAMWSP, DFID and WaterAid Bangladesh ( 2001), Rapid Assessment of Household Level Arsenic Removal Technologies, Phase-! and Phase-II, Final Report, WS Atkins International Limited.
BBS (1998), Sample Vital Registration System, Ministry of Planning, Govt. of People’s Republic of Bangladesh.
BBS (1997), Statistical Year Book of Bangladesh, Ministry of Planning, Govt. of People’s Republic of Bangladesh.
BBS (1999), Statistical Year Book of Bangladesh, Ministry of Planning, Govt. of People’s Republic of Bangladesh.
BBS, 2001, Population Census 2001 : Preliminary Report, Statistics Division, Ministry of Planning, Government of Bangladesh.
BGS and DPHE (2001), Arsenic Contamination of Groundwater in Bangladesh, Kinniburg, D.G. and Smedley. P.L. (Editors), Volume 2: Final Report. British Geological Survey Report WC/00/19.
Chen, H.W., Frey, M.M., Clifford, D., McNeill, L.S. and Edwards, M., 1999, Arsenic treatment considerations, Journal of American Water Works Association, 91(3), 74-85.
Cheng, C. R., Liang, S. Wang, H. C. and Beuhler, M. D. (1994), "Enhanced coagulation for arsenic removal", J. American Water Works Association, 86(9), 79-90.
Chowdhury, N.I., Ahmed, M. F. and Choudhury. J. R. (1987), Use of Rain Water for Water Supply in the Coastal Areas of Bangladesh. Proc. International Conference on Rain Water Cistern System, Thailand 14-17 January. 1987.
Dahi, E. and Liang, Q. (1998), Arsenic Removal in Hand Pump Connected Iron Removal Plants in Noakhali. Bangladesh, presented at International Conference on Arsenic Pollution of Ground Water in Bangladesh Causes, Effect and Remedies. Dhaka. 8-12 February 1998.
DPHE, (2000), Year Book (1998-99) : Rural Water Supply, Planning Circle, Department Of Public Health Engineering, Bangladesh.
DPHE, (2000), Data Book, 1999: Urban Water Supply, Planning Circle, Department of Public Health Engineering, Bangladesh.
DPHE, BGS, and MML (1999), Groundwater Studies for Arsenic Contamination in Bangladesh, Final Report (Phase-1), January.
DPHE and UNICEF (1994 Study to Forecast Declining Groundwater Level in Bangladesh, June.
DWASA (2000), Management Information Report for the Month of March, 2000.
EAWAG and SANDEC, (1998), SODIS News. No.3. August.
EPA,(1988), Special Report on Ingested Inorganic Arsenic. Skin Cancer; Nutritional Essentiality, US Environmental Protection Agency (EPA-625/3-87/013).
GOB (1997), Environmental Conservation Rules –1997, Bangladesh Gazette, Ministry of Environment and Forest, Government of People’s Republic of Bangladesh. 27 August.
Hering, J. G., Chen, P. Y., Wilkie, J. A., Elimelech, M. and Liang, S. (1996), Arsenic removal by ferric chloride, J. American Water Works Association, 88(4), 155-167.
Hering, J. G., Chen, P., Wilkie, J. A., Elimelech, M. (1997), Arsenic removal from drinking water during coagulation, J. Env. Eng., ASCE, 123(8), p.800-807.
Hussain, D. and Ziauddin, A.T.M, (1989) Rainwater use in Bangladesh - A case study in Dacope Upozilla, Proceedings of 4h International conference on Rainwater Cistern system. Manila, 2-4 August.
Jakel, M.R., (1994), Removal of arsenic in drinking water treatment. In J.O. Nriagu (Ed.) Arsenic in the Environment, Part 1: Cycling and Characterization, John Wiley & Sons, Inc., New York
Joshi, A. and Chaudhury, M. (1996), Removal of arsenic from groundwater by iron-oxide-coated sand, ASCE Journal of Environmental Engineering, 122(8), 769-771.
Kartinen, E. O. and Martin, C. J. (1995), An overview of arsenic removal processes, J. Desalination, 103, 79-88.
Khair, A. (2000), Factors responsible for the presence of arsenic in groundwater: Bangladesh context, In M.F.Ahmed (Ed.) Bangladesh Environment-2000, Bangladesh Poribesh Andolon, :198-209.
Khan, A.H., Rasul, S.B., Munir, A.K.M., Alauddin, M. Habibuddowlah, M. and Hussam,A, (2000). On two simple arsenic removal methods for groundwater of Bangladesh, In M.F.Ahmed (Ed.) Bangladesh Environment-2000, Bangladesh Poribesh Andolon, :151-173.
Khan, M.A.H, (1993), Environmental Aspects of Surface Water Development Projects, In: Environment and Development in Bangladesh, (Rahaman et al. edited), University Press Limited.
Kohnhorst, A. and Paul, P. (2000), Testing simple arsenic removal methods, In: Water, Sanitation and Hygiene: Challenges of the Millennium, Pre-prints of the 26 WEDC Conference, Dhaka, Bangladesh., 177-181.
MPO (1991). National Water Plan. Ministry of Irrigation, Water Development and Flood Control. Govt. of Bangladesh.
Mok, W.M., Wai, C.M. ( 1994). Mobilization of Arsenic in Contaminated River Water, In: Arsenic in the Environment ( J.O. Nriagu Ed.), John Wiley & Sons Inc.
Murcott, S. 2000, A Comprehensive Review of Low-cost, Well-Water Treatment Technologies for Arsenic Removal, http://phys4.harvard.edu/~wilson/murcott2.html,
Nath,. K.J. And Majumder, A. (1997). -Arsenic In Groundwater: Technical Options And Methodology For Removal. Presented At The Training Workshop On Arsenic Problems And Dearsination Of Water For Use In Bangladesh. August. 1997.
Nikolaidis,N.P. and Lackovic, J. (1998), Arsenic Remediation Technology-AsRT, presented at International Conference on Arsenic Pollution of Ground Water in Bangladesh: Causes, Effect and Remedies, Dhaka, 8-12 February.
Oh, J.I., Yamamoto, K., K., Kitawaki, H., Nakao, S., Sugawara, T., Rahaman, M.M. and Rahaman, M.H. (2000), Application of low-pressure nanofiltration coupled with a bicycle pump for the treatment of arsenic-contaminated groundwater, Desalination, 132 : 307-314.
Pierce, M.L. and Moore, C.B. (1982), Adsorption of Arsenite and Arsenate on amorphous iron hydroxide, Water Resources, 16, 1247-1253.
Pontius, F.W.(Ed.),1990, Water Quality Treatment: a handbook of community water supplies, American Water Works Association, McGraw-Hill, New York.
Sarkar, A., Thogersen, Choudhury, Rahaman, Akhter and Choudhury (2000), Bucket Treatment unit for arsenic removal, In Water, Sanitation and Hygiene: Challenges of the Millennium, Pre-prints of the 26 WEDC Conference, Dhaka, Bangladesh., 308-310.
Shen, Y. S. (1973), Study of arsenic removal from drinking water", J. American Water Works Association, 65(8), 543-548.
Shin Nihon Salt Co. Ltd. (2000), Report on Performance of Read-F Arsenic Removal Unit (ARU), October.
SOES and DCH (2000), Groundwater Arsenic Contamination in Bangladesh, A. Summary of Field Survey from August 1995 to February, 2000: B. Twenty Seven Days Detailed Field Survey Information from April 1999 to February 2000, April.
Sorg, T.J. and Logsdon, G.S. 1974, Treatment technology to meet the interim primary drinking water regulations for inorganics: Part 2, Journal of the American Water Works Association, 70(7), 379-393.
UNICEF and WHO (1999), Water Supply and Sanitation Sector Questionnaire-1999, Global Water Supply and Sanitation Assessment-2000.
Wegelin, M., Gechter, D., Hug, S., Mahmud, A., Motaleb, A. (2000), SORAS-a simple arsenic removal process (http://phys4.harvard.edu/~ wilson/mitigation/SORAS_ Paper.html).
WHO (1993), Guidelines for Drinking Water Quality, 2nd Edition, World Health Organization, Geneva, Switzerland.
Young, E (1996), Cleaning up arsenic and old waste, New Scientist, 14 December : 22